Process

Eight steps, in this order, every time. The only part that varies is how long the third one takes.

Stacked paper files
PREPARATION
Archive boxes with labels
RECEIPTED / BOXED

Custody

While material is with us it is stored in a locked, alarmed room, and it is never subcontracted. If a job needs a capability we do not have — very large formats, badly degraded film — we will say so and name someone, rather than quietly sending your collection elsewhere.

You can visit while the work is in progress. People rarely do, but the offer is meant, and the answer is always yes.

Timescales

Survey to proposal
Within two weeks of the visit.
Small job
Under 2,000 images: three to four weeks from collection.
Typical job
2,000–20,000 images: two to four months, with the originals returned in batches if you need access to them meanwhile.
On-site work
Quoted by the day, including our own equipment and lighting.
Quillan Archives · studio@quillanarchives.com